🇵🇱 Solar Calculator Poland

Enter your monthly electricity bill and region — get solar system size, Moj Prad 6.0 grant, net-billing spot-price savings, ulga termomodernizacyjna tax deduction (up to PLN 53K), and payback period.

PLN
Solar system results — Poland
6 kWp — 1022 kWh/kWp/yr
Monthly usage estimate500 kWh/mo
Annual solar production6132 kWh/yr
Self-consumption savings (net-billing)1472 zł/yr
Surplus export income (spot ~0.28 PLN/kWh)1202 zł/yr
Total annual benefit2674 zł/yr
System cost range24 000 zł36 000 zł
Total net cost30 000 zł
Ulga termomodernizacyjna (tax deduction)up to 6900 zł tax saved
Payback period11.2 years
25-year net savings36 839 zł
Ulga termomodernizacyjna: Odlicz do 53 000 zł od podstawy opodatkowania (w PIT). Przy stawce 23%: oszczędność do 6900 zł. Dokumentuj wszystkie faktury od instalatora z NIP.
Link copied to clipboard

How to Use the Poland Solar Calculator

Enter your monthly electricity bill in PLN, select your region (which sets peak sun hours), choose a system size in kWp, and optionally apply the Moj Prad 6.0 grant and battery toggle. Results update instantly with net-billing savings, surplus export income, Moj Prad grant deduction, ulga termomodernizacyjna tax benefit, payback, and 25-year projections.

Solar in Poland — Key Numbers 2026

Net-Billing System (post-2022)

Poland switched from net-metering to net-billing on April 1, 2022. Under net-billing:

Systems installed before April 2022 under net-metering keep that scheme until 2029 (grandfathered). New installations use net-billing only.

Moj Prad 6.0 — Grant Details

The Moj Prad (My Power) program provides non-repayable grants for residential solar:

Ulga Termomodernizacyjna

The thermal modernization tax relief (ulga termomodernizacyjna) allows homeowners to deduct up to PLN 53,000 in solar panel and battery costs from their income tax base:

Calculation Formula

Annual production (kWh) = System kWp × PSH × 365 × 0.80 (system efficiency)
Self-consumed kWh = Annual production × 30% (no battery) or 60% (with battery)
Exported kWh = Annual production × (1 - self-consumption ratio)
Annual benefit = Self-consumed × 0.80 PLN + Exported × 0.28 PLN (spot)
System cost = kWp × (PLN 4,000–6,000) + Battery cost
Net cost = System cost − Moj Prad grant
Payback = Net cost ÷ Annual benefit
Ulga tax saving = min(system cost, PLN 53,000) × 23%

Worked Example — Warsaw 6 kWp

Warsaw (Mazowieckie): 3.5 PSH. System: 6 kWp at PLN 5,000/kWp = PLN 30,000.

FAQ

Is solar worth it in Poland after the switch to net-billing?

Yes, but the economics changed. Under net-billing, self-consumption is now far more valuable than exporting surplus. Adding battery storage (increasing self-consumption from 30% to 60%) significantly improves payback. Combined with Moj Prad 6.0 and ulga termomodernizacyjna, effective payback periods of 8–12 years are achievable even in cloudy Pomerania.

Can I still benefit from the old net-metering (net-metering) system?

Only if you installed before April 1, 2022. Those installations keep the net-metering scheme (80/70 rule: small systems get 80% of exported energy credited back) until December 2029. After that, all systems will operate under net-billing. If you're on the old scheme, postponing your next installation decision until closer to 2029 may make sense.

How do I apply for Moj Prad 6.0?

Apply online through mojprad.gov.pl after installation and grid connection. Required documents: faktura VAT from certified installer, grid connection agreement (umowa z OSD), technical parameters of the system, bank account number, property ownership confirmation. Processing time: 30–60 days. Grants paid directly to your bank account.

What VAT rate applies to solar panels in Poland?

Solar panels and installation are subject to 8% VAT for residential buildings (nie dla zabudowy mieszkaniowej jednorodzinnej). Commercial installations use the standard 23% VAT rate. Your installer will apply the correct rate. Always verify the VAT rate on your invoice before claiming ulga termomodernizacyjna.

Do I need a building permit for solar panels in Poland?

For roof-mounted solar systems up to 50 kW, no building permit (pozwolenie na budowę) is required — only a grid connection application with your OSD (Distribution System Operator: Tauron, Energa, PGE, Enea). The OSD has 30 days to approve connections up to 50 kW. Systems over 50 kW require a full building permit and environmental assessment.